Home and Multiplex Construction in Port Moody, BC

This page sets out what the City of Port Moody publishes on lot unit limits, hillside lots, the Moody Centre and Oceanfront planning areas, coach houses and suites, and permits.

Costar Construction is a construction management company in Vancouver, and its website lists Port Moody as a serviced area. The Port Moody facts below come from City and provincial pages read on September 25, 2026.

Building in Port Moody: the local rules

British Columbia's Bill 44 (2023) requires cities to allow small-scale, multi-unit housing on lots zoned for one house or a duplex, with no rezoning. Port Moody calls this SSMUH and approved its zoning changes in June 2024 (Bylaw No. 3460). As of the City's SSMUH page, last updated July 2025, an eligible lot under 280 m² (3,014 sq. ft.) may hold 3 homes, a lot from 280 m² to 4,050 m² (1 acre) may hold 4, and a lot in that size range within 400 m of a bus stop with service every 15 minutes or less may hold 6.

Per that page, lots inside the Transit-Oriented Areas around Moody Centre and Inlet Centre SkyTrain stations follow separate provincial rules, and a registered building scheme takes precedence over SSMUH. A building scheme is a legal agreement on a property title, often from the 1950s or 1960s, that can limit building size, style or the number of homes. The City will process an application on such a lot only after a court order discharges the scheme. In the small-lot zone RS1-S, a subdivision requires a title agreement that limits each lot to 3 homes (City guide, July 4, 2025).

The same page allows a laneway house, coach house or other small separate home when it meets the SSMUH-RS1 zoning requirements. The City's guide (July 4, 2025) shows a 3-home example on a 557 m² lot: a house with a secondary suite, plus a laneway house. The City's Secondary Suites page (read September 25, 2026) says Port Moody has allowed secondary suites in single detached zones since 2004 and in its duplex zone since 2018.

The City's page and guide date from July 2025. The Province required bylaw updates under Bill 25 by June 30, 2026, and no City page opened on September 25, 2026 says whether these limits changed, so confirm the current limits with City planning before you design.

The homes and streets of Port Moody

The City's Official Community Plan, its long-term land-use plan, was adopted on April 28, 2026 and covers 15 neighbourhoods. Pleasantside and April Road have mostly single detached homes, with a few townhouse projects along Ioco Road. Ioco Road carries traffic to and from Belcarra and Anmore, so the plan keeps development there at low density until another access route to those areas exists.

Moody Centre is the neighbourhood the plan calls the city's most varied in land use. It holds a heritage conservation area, light industry on Murray Street and Spring Street, and a residential area south of St. Johns Street that the City will study further before writing a neighbourhood plan.

Two parts of Moody Centre are large-site planning areas. In the Transit-Oriented Area Core around Moody Centre Station, the plan considers towers of up to 39 storeys on some parcels north of Spring Street. The Oceanfront District, the former Mill and Timber sawmill site, has a site-wide maximum of 3,397 homes and 38 storeys, with at least 5,110 m² of floor area for homes built to be rented.

Port Moody also has hillside rules (Official Community Plan Appendix 2, April 28, 2026). Development Permit Area 5 covers hazardous lands and steep slopes, and the plan defines a steep slope as natural ground at 20% (11 degrees) or steeper for at least 10 m horizontally. The plan names the Harbour Heights escarpment as a place at risk of erosion and land slippage. Inside the area, the City requires a geotechnical report (a study of soil and slope stability by a professional engineer or geoscientist) for every subdivision, new main building and development permit, with a few exceptions. Approval requires an agreement registered on your title, and clearing and earthwork may start only after the City approves the plans.

What Costar Construction builds here

Costar Construction lists Port Moody among its serviced areas. According to the 2024 winners list of the Canadian Home Builders' Association of British Columbia, Costar Construction won the Georgie Award for Best Multiplex Home for its project It Takes Two. Costar's website describes these services:

  • Multiplex: a small-scale townhouse project on a single lot.
  • Custom Home: work starts from a brief description of your ideas, then moves to floor plans and 3D conceptual models.
  • Kitchen renovation and bathroom renovation.
  • Commercial and tenant improvements (new work inside a leased commercial space) for wellness and beauty, healthcare, hospitality, office and retail, and childcare.
  • Laneway Home and Legal Suite: listed for Vancouver, Burnaby and New Westminster.

Planning and permits in Port Moody

As of September 25, 2026, the City says most new development needs City review before construction. Depending on the project, the City may require a development permit, a change to the lot's zoning, a split of the lot or a heritage permit before the building permit. Owners in the Moody Centre or Ioco Townsite heritage conservation areas may need a heritage alteration permit.

A development permit is the City's approval of a project's design and site conditions. The City lists six development permit areas, and which ones apply depends on your address. SSMUH projects need one, which reviews building design and neighbourhood fit, before the building permit, and City staff can approve it. For a complete submission on an uncomplicated site, the City's guide (July 4, 2025) says to expect first comments in 4 to 6 weeks on a development permit and 8 weeks on a building permit. Timelines vary with each application.

The City's building page (read September 25, 2026) says you apply for a building permit online through the Port Moody eServices portal, and every application needs a waste management plan. Retaining walls over 1.2 m (4 ft.) high need a permit, and demolition needs a separate deconstruction permit.

Council adopted an Amenity Cost Charge bylaw on July 28, 2026. It is a one-time fee on new development that helps pay for community facilities, paid at building permit approval for multi-unit projects of up to 6 homes.

Starting a project with Costar

Costar offers a complimentary one-hour project consultation at your property or at its Vancouver office, 104 - 338 W 8th Ave. Book it on the booking page of Costar's website, or use the contact page. The website describes five stages, and the first four are Design and Planning, Pre-construction, Construction and Handover.

Questions about building in Port Moody

How many homes can I build on my lot in Port Moody?

As of the City's SSMUH page (July 2025), an eligible lot under 280 m² may hold 3 homes, a lot from 280 m² to 4,050 m² may hold 4, and a lot in that size range within 400 m of a bus stop with service every 15 minutes or less may hold 6. Lots over 4,050 m² and lots inside a Transit-Oriented Area fall outside the small-scale rules. The City links to the Provincial Housing Statutes Online Mapping tool, where clicking your lot shows how many homes it may hold.

Can I add a coach house or a secondary suite?

On an eligible lot, the City's SSMUH page (July 2025) allows a laneway house, coach house or other small separate home that meets the SSMUH-RS1 zoning requirements. Each primary home may have one secondary suite, which counts toward the lot's total (City guide, July 4, 2025). Costar's website lists laneway home and legal suite services for Vancouver, Burnaby and New Westminster, so raise a Port Moody project at the consultation.

What happens if my lot is on a steep slope?

If your lot is inside Development Permit Area 5, the City requires a geotechnical report for every subdivision, new main building and development permit, with a few exceptions. Steep means 20% (11 degrees) or more over at least 10 m (Official Community Plan Appendix 2, adopted April 28, 2026). City planning, at 604.469.4540, can confirm whether your address is inside the area.

What are the Moody Centre and Oceanfront planning areas?

Both lie in Moody Centre, and the Official Community Plan (adopted April 28, 2026) marks them for large developments that combine homes with shops, offices and other uses. The plan considers towers of up to 39 storeys on some parcels in the station area, and the Oceanfront District has a site-wide maximum of 3,397 homes and 38 storeys. If your property is near either area, ask City planning which rules apply.

Which permits do I need, and where do I apply?

A new home, renovation or addition needs a building permit, applied for online through the City's eServices portal (City page, read September 25, 2026). The Building Permits office answers questions at 604.469.4534.

What happens if my Port Moody lot has a building scheme on title?

A building scheme is a legal agreement on a property title, often from the 1950s or 1960s, that can limit building size, style or the number of homes, and it takes precedence over Port Moody's small-scale housing rules. The City will process a small-scale housing application on such a lot only after a court order discharges the scheme.

How large can development get in Port Moody's Oceanfront District?

Port Moody's Official Community Plan, adopted April 28, 2026, sets a site-wide maximum for the Oceanfront District, the former Mill and Timber sawmill site, of 3,397 homes and 38 storeys, with at least 5,110 square metres of floor area reserved for homes built to be rented. Towers up to 39 storeys are also under consideration on some parcels in the nearby Transit-Oriented Area Core around Moody Centre Station.

How long does a Port Moody development permit review take?

For a complete submission on an uncomplicated site, Port Moody's guide of July 4, 2025 says to expect first comments in 4 to 6 weeks on a development permit and 8 weeks on a building permit, though timelines vary with each application. A geotechnical report from a professional engineer or geoscientist is required for projects inside the City's steep-slope Development Permit Area 5.

Sources

Every rule and figure on this page comes from the pages below, checked on 2026-09-25.

  1. Small-Scale, Multi-Unit Housing (SSMUH)City of Port Moody. Checked 2026-09-25. Page last updated July 2025. Unit limits by lot size, 400 m bus stop rule, Bylaw No. 3460, building schemes, coach house and laneway answer, Transit-Oriented Area exemption, RS1-S and Moody Centre Heritage Character Area guidance, provincial mapping tool.
  2. A Guide to SSMUH (Small-Scale Multi-Unit Housing) Development, Version 1.0, July 4, 2025City of Port Moody. Checked 2026-09-25. RS1-S three-home title agreement, secondary suite rules inside SSMUH (one per primary home, counts toward the lot total), 557 m2 three-home example, development permit before building permit, initial comment times of 4 to 6 weeks and 8 weeks.
  3. Official Community Plan: Port Moody 2050City of Port Moody. Checked 2026-09-25. Plan adopted by Council on April 28, 2026; list of chapters and appendices.
  4. Chapter 14: Neighbourhood Plan Areas, Official Community Plan Bylaw, 2026, No. 3522City of Port Moody. Checked 2026-09-25. 15 neighbourhoods; Pleasantside and April Road and Ioco Road policy; Heritage Mountain area; Moody Centre description; South of St. Johns Street Special Study Area; Moody Centre Station Transit-Oriented Area Core heights; Oceanfront District limits.
  5. Appendix 2: Development Permit Area Guidelines, Official Community Plan Bylaw, 2026, No. 3522City of Port Moody. Checked 2026-09-25. Development Permit Area 5 steep slope definition, geotechnical report triggers and exemptions, title agreement, clearing rule, Harbour Heights escarpment, Map 16 and Schedule 6.
  6. Development PermitsCity of Port Moody. Checked 2026-09-25. Six development permit areas; SSMUH permits are minor development permits that staff can approve; planning contact details.
  7. Development Application ProcessCity of Port Moody. Checked 2026-09-25. Types of applications before a building permit; heritage alteration permits in Moody Centre and Ioco Townsite.
  8. Building and RenovatingCity of Port Moody. Checked 2026-09-25. Online building permit application through eServices, waste management plan, retaining wall permit above 1.2 m, deconstruction permit, Building Permits phone number.
  9. Secondary SuitesCity of Port Moody. Checked 2026-09-25. Secondary suites allowed in single detached zones since 2004 and in the duplex zone since 2018.
  10. Transit Oriented AreasCity of Port Moody. Checked 2026-09-25. Page last updated December 2025. Transit-Oriented Areas designated around Moody Centre and Inlet Centre SkyTrain stations under Bill 47.
  11. Amenity Cost ChargesCity of Port Moody. Checked 2026-09-25. Bylaw adopted July 28, 2026; charge paid at building permit approval for medium-density projects; medium-density category covers multi-unit projects of up to six homes.
  12. Small-scale, multi-unit housingProvince of British Columbia. Checked 2026-09-25. Page last updated January 20, 2026. Provincial 3, 4 and 6 unit requirements, 280 m2 threshold, frequent bus service definition.
  13. 2024 Georgie Award Winners news releaseCanadian Home Builders' Association of British Columbia (CHBA BC). Checked 2026-09-25. Costar Construction Inc, project It Takes Two, listed under Best Multiplex Home (release dated May 27, 2024).