Skip to main content
COSTAR
A white bathroom with a lit mirror, a dark vanity and a window

Service

Bathroom

A bathroom renovation planned for daily use and long-term home value, not just a fresh look.

Waterproofing and plumbing come first

A bathroom renovation depends on getting plumbing, waterproofing and ventilation right before any finish goes on. Costar's construction manager coordinates the plumber, electrician and tile trades and confirms rough-in inspections pass before the client's chosen fixtures, tile and cabinetry are installed.

Fixtures and surfaces from the same trade network

Bathroom projects draw on the same countertop and fixture suppliers Costar uses across its work, including Tavstone for stone fabrication and Cosentino for surfaces, so the client is choosing from materials Costar's crews already install regularly.

Free tool

See your own bathroom renovated

Upload a photo of your room and pick a look. In about ten seconds you get that same room renovated, with your walls, windows and layout kept where they are.

1

Add a photo of your room

Stand in the doorway and get as much of the room in frame as you can. Turn the lights on.

Take one now or pick from your library. JPEG, PNG or WebP.

Your first design is free, and you do not need to give us your details to see it.

Questions

Frequently asked questions about Bathroom

What happens first in a bathroom renovation?

Plumbing, waterproofing and ventilation are addressed first, before any tile or fixture goes in. Costar's construction manager checks that required rough-in inspections for plumbing and electrical pass before finishing work starts, the same standard applied across Costar's construction stage on every project type.

Which suppliers does Costar use for bathroom countertops and tile?

Costar works with Tavstone for custom quartz, granite and marble countertop fabrication and with Cosentino for surfaces.

Does a bathroom renovation need a permit in Vancouver?

Permit requirements depend on the scope of work. Costar's standard process includes securing any permits and approvals needed before construction starts, and factoring the time and cost of that regulatory step into the project schedule and budget.

How does Costar check the quality of a finished bathroom?

A Costar construction manager supervises the crew and subtrades through the build and reviews the finished work before signing off, following the same handover and quality-check steps used across all Costar renovation and construction projects.

Why does waterproofing matter in a bathroom renovation?

Waterproofing has to be correct before any tile or fixture is installed, because a bathroom renovation depends on getting plumbing, waterproofing and ventilation right first. Costar's construction manager confirms rough-in inspections pass before finishes go in, so a waterproofing problem is caught before it is covered over.

Which suppliers does Costar use for bathroom stone and surfaces?

Costar uses Tavstone for custom quartz, granite and marble countertop fabrication and Cosentino for surfaces on bathroom projects.

Who coordinates the plumber, electrician and tile trades on a bathroom renovation?

A Costar construction manager coordinates the plumber, electrician and tile trades on a bathroom renovation and confirms that rough-in inspections pass before the client's chosen fixtures, tile and cabinetry are installed.

Is a bathroom renovation planned only for looks, or for long-term use too?

Costar plans a bathroom renovation for daily use and long-term home value, not only for a fresh look, which is why plumbing, waterproofing and ventilation are addressed before any finish work begins.

Start the conversation

Create your dream home. Tell us about your project today.