Building in Vancouver, BC: R1-1 Rules, Permits and Projects
Since October 17, 2023, every area of Vancouver that was zoned RS, the City's single-house zones, has been in the R1-1 (Residential Inclusive) zone. It lets an owner build a multiplex, which the City defines as 3 to 8 homes on one site, each with its own outside entrance. BC law sets its own minimum number of homes for the same lots, and this page shows how the two sets of rules relate.
Costar Construction is a construction management company with its office at 104-338 W 8th Ave, Vancouver. This page covers the current rules, Costar's projects in the city and how to book a consultation.
Building in Vancouver: the local rules
The City's multiplex page (updated July 17, 2026, and checked September 25, 2026) defines a multiplex as housing with 3 to 8 dwelling units across one or more buildings on a single site, where every unit has its own direct exterior entrance. Council approved the change on September 14, 2023, and the by-law took effect on October 17, 2023. The Province's policy manual states that the eight-unit option is for secured rental housing.
The Province added its own minimums in fall 2023 through Bill 44, its small-scale multi-unit housing law. As of the Province's policy manual, updated for changes passed on November 27, 2025, a city must allow, in zones that only allowed single houses or duplexes (called restricted zones), at least 3 units on a lot of 280 m² or less and at least 4 units on a larger lot. It must allow 6 units on a larger lot within 400 metres of a bus stop served at least every 15 minutes on average (7 am to 7 pm on weekdays, 10 am to 6 pm on weekends). Zoning updates were due by June 30, 2026. For Vancouver, the manual cites section 565.04 of the Vancouver Charter for the lot exemptions.
In May 2024 the City reported that the provincial law did not classify R1-1 as a restricted zone, so it proposed no change to R1-1. Its May 2024 proposal named five other zones instead: RT-7, RT-9, First Shaughnessy District, CD-1 (371) and CD-1 (463). The City's timeline lists those changes as completed in spring 2024 and now shows a multiplex review and work on Bill 25, the Province's fall 2025 revisions, for 2026 to 2027.
Laneway houses and secondary suites follow separate rules. The Province requires cities to allow at least one secondary suite (a second self-contained home inside a house) or one detached accessory dwelling unit (a small separate home such as a laneway house) in restricted zones. To legalize a suite built without a building permit, the owner works with the City to bring it into line with the BC Building Code (provincial FAQ, version of May 30, 2024).
Site rules such as floor space ratio (floor area divided by lot area), lane access, frontage and parking are set in the R1-1 District Schedule. The City's multiplex project page says sites in the Designated Floodplain (land at risk of flooding) are excluded. Confirm every site rule for your lot with the City's Development and Building Services Centre before you design.
For the frontage table that sets unit count by lot width, the City's current Development Cost Levy rate, and the typical building permit timeline, see Costar's multiplex zoning and permits guide. For construction, land and city-fee cost figures by unit count, see the multiplex cost guide. For the full guides by building type, read the multiplex guide, the custom home guide and the laneway home guide.
The homes and streets of Vancouver
Vancouver has 22 local areas, according to the City's open data. Costar's Vancouver portfolio includes projects named for Kitsilano, Dunbar, Killarney and Arbutus Quilchena.
In 2025 the City issued 376 new-building permits in the Multiple Dwelling category, up from 142 in 2024. The count for 2026 reached 219 by September 24. A multiplex with a front and a rear building can need two permits, so permits can outnumber projects.
By local area in 2025, Kensington-Cedar Cottage had 48 of those permits, Hastings-Sunrise 45 and Renfrew-Collingwood 35. Arbutus Ridge had 31, Dunbar-Southlands 24, Killarney 15 and Kitsilano 14. The City also issued 365 laneway house permits in 2025, compared with 730 in 2018.
In the City's 2026 property tax report, 65,706 of 228,869 records (28.7 percent) list R1-1 as the zoning district. Connaught Park (5.98 hectares) is at 2390 West 10th Avenue in Kitsilano, on the same avenue as Costar's Kitsilano projects.
What Costar Construction builds here
Costar describes a multiplex as a small-scale townhouse project on a single lot. It also builds custom homes, starting from a short description of your ideas and moving to floor plans and 3D models. Its website lists laneway homes and legal suites as available in Vancouver, Burnaby and New Westminster, plus kitchen and bathroom renovations and commercial and tenant improvement work (fitting out a rented commercial space) for wellness and beauty, healthcare, hospitality, office and retail, and childcare.
CHBA BC, the Canadian Home Builders' Association of BC, lists Costar Construction Inc. as the winner of the 2024 Georgie Award for Best Multiplex Home, for the project It Takes Two (winners list of May 27, 2024).
Six of Costar's Vancouver projects are:
- Quintet Townhomes: a 5-plex multiplex at 2240 E 40th Ave.
- We Killarney Townhomes: a 6-plex multiplex at 2333 E 54th Ave.
- Arbutus Quilchena Farm House: a custom newbuilt duplex at 2145 West 32nd.
- Kitsilano Custom Laneway Home: a laneway home at 2762 West 10th Avenue.
- Kitsilano Custom Legal Suite: a legal suite at the same address.
- Vancouver Dunbar Custom Home: a single-family home at 3360 West 30th Avenue.
Planning and permits in Vancouver
The City's Development and Building Services Centre answers questions on site eligibility, R1-1 regulations and permit applications. The City's project page points to an interactive zoning map at maps.vancouver.ca/zoning for checking whether a property is eligible.
Building permits are required for new buildings, additions, alterations and demolitions (City open data). Ask the Development and Building Services Centre which applications your project needs.
Starting a project with Costar
Costar offers a complimentary one-hour project consultation, held at your property or at its Vancouver office at 104-338 W 8th Ave. You can use the booking page or the contact page, email info@costarconstruction.com or call 236-997-0026.
Costar lists five stages on its website. The first four are Design and Planning, Pre-construction, Construction and Handover.
Costar projects in Vancouver

Quintet Townhomes
2240 E 40th Ave, Vancouver

We Killarney Townhomes
2333 E 54th Ave, Vancouver

Arbutus Quilchena Farm House
2145 West 32nd, Vancouver

Kitsilano Custom Laneway Home
2762 West 10th Avenue, Vancouver

Kitsilano Custom Legal Suite
2762 West 10th Avenue, Vancouver

Vancouver Dunbar Custom Home
3360 West 30th Avenue, Vancouver
Questions about building in Vancouver
How many homes can I build on a lot in Vancouver?
The City defines a multiplex as 3 to 8 dwelling units on one site, and the provincial manual states that the eight-unit option is for secured rental. BC law requires at least 3 units on a lot of 280 m² or less and at least 4 on a larger lot. Other conditions also apply, including a location outside the Designated Floodplain (checked September 25, 2026).
Can I build a multiplex on a floodplain lot in Vancouver?
The City's multiplex project page says sites in the Designated Floodplain are excluded. The Designated Floodplain covers areas along False Creek, the Fraser River and Still Creek (City open data, checked September 25, 2026). Use the City's zoning map at maps.vancouver.ca/zoning or call the Development and Building Services Centre to check a property.
Can I build a laneway house or a secondary suite in Vancouver?
BC law requires cities to allow at least one secondary suite or one detached accessory dwelling unit, such as a laneway house, in restricted zones. Costar's website lists laneway homes and legal suites as services available in Vancouver.
Where do I check whether my Vancouver lot is eligible?
The City's project page points to an interactive zoning map at maps.vancouver.ca/zoning for checking whether a property is eligible. The Development and Building Services Centre answers questions on site eligibility, R1-1 regulations and permit applications.
How do I start a project with Costar Construction in Vancouver?
Book the complimentary one-hour project consultation, held at your property or at Costar's Vancouver office at 104-338 W 8th Ave. Use the booking page, email info@costarconstruction.com or call 236-997-0026. Costar's website lists Vancouver as one of eight areas it serves.
How many building permits did Vancouver issue for multiplexes in 2025?
The City of Vancouver issued 376 new-building permits in the Multiple Dwelling category in 2025, up from 142 in 2024, and reached 219 by September 24, 2026. A multiplex with a front and a rear building can need two permits, so the permit count can be higher than the number of actual projects.
Did Vancouver change the R1-1 zone under the newest provincial housing law?
No. In May 2024 the City reported that the provincial law did not classify R1-1 as a restricted zone, so it proposed no change to R1-1 itself. Its May 2024 proposal named five other zones instead: RT-7, RT-9, First Shaughnessy District, CD-1 (371) and CD-1 (463), with further multiplex review work planned for 2026 to 2027.
What share of Vancouver properties are zoned R1-1?
In the City of Vancouver 2026 property tax report, 65,706 of 228,869 records, or 28.7 percent, list R1-1 as the zoning district. R1-1 is the zone Council created on September 14, 2023, letting an owner build 3 to 8 homes with their own outside entrances on one site.
Sources
Every rule and figure on this page comes from the pages below, checked on 2026-09-25.
- Adding missing middle housing and simplifying regulations in low density neighbourhoodsCity of Vancouver (Shape Your City). Checked 2026-09-25. Multiplex definition (3 to 8 units, own exterior entrance), council approval September 14, 2023, R1-1 in effect October 17, 2023, floodplain exclusion, project timeline (2026 to 2027 review and Bill 25). Page last updated July 17, 2026.
- Multiplexes project news feedCity of Vancouver (Shape Your City). Checked 2026-09-25. R1-1 not a restricted zone under provincial law (May 2024), proposed changes to RT-7, RT-9, FSD, CD-1 (371) and CD-1 (463), by-law enactment October 17, 2023.
- Nov 2023 - R1-1 Documents and Application Materials AvailableCity of Vancouver (Shape Your City). Checked 2026-09-25. Zoning map link, R1-1 how-to guide and checklist, Development and Building Services Centre as the contact for eligibility and permit questions.
- Small-scale, multi-unit housingProvince of British Columbia. Checked 2026-09-25. 3 units on lots of 280 m² or less, 4 units above 280 m², six units near frequent bus service, bus frequency definition, compliance deadlines. Page last updated January 20, 2026.
- Small-Scale, Multi-Unit Housing Provincial Policy Manual & Site StandardsProvince of British Columbia. Checked 2026-09-25. Restricted zone definition (as of Royal Assent November 27, 2025), June 30, 2026 zoning deadline, unit minimums, 400 m bus stop rule, Vancouver Charter section 565.04, secondary suite and detached accessory dwelling unit minimum, Vancouver's eight-unit secured rental option.
- Frequently Asked Questions for Bill 44 (Small-Scale, Multi-Unit Housing), version May 30, 2024Province of British Columbia. Checked 2026-09-25. Suites built without a building permit are not legalized by the law and must be brought into compliance with the BC Building Code.
- Issued building permitsCity of Vancouver Open Data. Checked 2026-09-25. 2025 and 2026 counts of new-building permits by specific use category (Multiple Dwelling, Laneway House, Duplex) and by local area, computed with the dataset's query interface on the accessed date; latest issue date in the data was September 24, 2026. Also the statement that building permits are required for new buildings, additions, alterations and demolitions.
- Property tax reportCity of Vancouver Open Data. Checked 2026-09-25. 65,706 of 228,869 records in report year 2026 list zoning district R1-1 (62,767 land, 2,896 strata, 43 other records). Dataset last modified September 21, 2026; the City notes zoning data should be checked against its zoning pages.
- ParksCity of Vancouver Open Data. Checked 2026-09-25. Connaught Park, 5.98 ha, at 2390 W 10th Avenue in the Kitsilano local area.
- Local area boundaryCity of Vancouver Open Data. Checked 2026-09-25. The City has 22 local areas, including Kitsilano, Dunbar-Southlands, Killarney and Arbutus Ridge.
- Designated floodplainCity of Vancouver Open Data. Checked 2026-09-25. Designated Floodplain covers the coastal floodplain in False Creek and the Fraser River and the Still Creek floodplain.
- 2024 Georgie Award Winners (news release, May 27, 2024)Canadian Home Builders' Association of British Columbia (CHBA BC). Checked 2026-09-25. Best Multiplex Home: project It Takes Two, Costar Construction Inc, associate company Design Work Group Ltd.